Home | Site map | Contact
Our company Our products Information Centre Balmoral Tanks e-learning


XXGRP water storage
XX-

XX
Design and manufacturing
XX-
XXTank construction
XX Flange types
XX Clearance requirements
XX External plan sizes
XX Base supports

XX Air gap calculator
XX-
XXFire fighting sprinkler systems
XX-
XXPhoto gallery
XX-
XXGRP one-piece tanks
XX-
XXContact



XXClick to download the GRP sectional water storage tanks brochure (PDF 1.2mb)
XXGRP Sectional water tanks
XXbrochure (PDF 1.2mb)

XXClick to download the Balmoral Sectional Tanks M100 Sectional tank specification (PDF 432kb)
XXSectional Tank specification (PDF 432kb)


XXClick to download the Balmoral sectional tank operation and maintenance manual (PDF 1mb)
XXOperation/maintenance manual (PDF 1mb)


Clearance requirements

All installations require a clearance of 500mm above manway.

A minimum clearance of 350mm is required above the tank to comply with water regulations.

Sectional tank clearance requirements
 
© Balmoral Group 2008 | Legal | Privacy policy