Locating your sewage treatment plant
Sewage treatment plant for a single household should be sited 15m* from the house. Approval and agreement should be sought from your local authority as early as possible. Although the HydroClear is virtually odour-free, please also consider the prevailing wind direction when choosing your site.
* 7m in ROI
Installations serving more than one building should be located at least 25m from habitable buildings. Some local authorities may allow HydroClears to be installed somewhat closer, but this needs to be checked and approved locally.
Don’t situate your treatment plant close to a driveway, roadway or anywhere else that presents a risk of superimposed loads and remember - good access must be available for the tanker to empty your plant
Site levels
Be sure to survey the site and check levels and the fall on the drain carefully. The Balmoral HydroClear is designed to cater for a drain invert depth of 1m but this can be reduced to 750mm or increased using a Balmoral-supplied extension to suit specific site requirements.
After sales service
Balmoral Tanks offers a nationwide service to cover all aspects of maintenance on Balmoral products. Packages can be tailored to your requirements from basic maintenance contracts, including on-going support and advice from legislative bodies, through to emergency call-out.
|
Installation gallery
Installation of 6-pop model
Detailed installation documentation
Click here to download the Balmoral HydroClear installation and operating instructions
|